Commissioning Date Plant name & its capacity Site
1956.1 The first set of 30m3 /h ASP Hangzhou General Mechanism Factory
1958.4 The first set of 3350m3 /h ASP imitating the Soviet Union  
1958.7 The first set of 3350m3 /h ASP designed by ourselves  
1982.8 6000m3 /h ASP of purification process by molecular sieve Shanghai General Factory of Petrochemical
1982.10 11000m3 /h ASP of process with reversing heat exchanger Baotou Steal Plant
1983 five rare gases recovery equipments of 6000m3/h ASP  
1993 14000ASP with the booster turbine expander of the normal temperature purification process by molecular sieve Xiangtan Iron & Steal CO.,LTD
2002.12 the first set of 30000m3 /h ASP designed by ourselves Bao Steal CO.,LTD
2004.6 the first set of 50000m3 /h ASP designed by ourselves Beitai Steal Company
2004.6 18000m3/h ASP of Internal compress process Haolianghe Chemical Company
2004.10 20000m3/h large ASP of internal compress process Changzhou Zhongtian Steal Company